Parklane Landscaping Corporation - Stone Mountain HOA Front Entry Monument Revitalization Timeline

  • Period: to

    Demolition Phase

    Removal of plant material (excluding large oaks and sculpted Pride of Houston Yaupon); Mid-sized oak tree at light pole to be removed; Removal of rocks (to be placed at side entrance to be repurposed by HOA); Removal of old irrigation system and parts; Careful conservation of electricity lines and main irrigation lines;
  • Period: to

    Turf and Soil Removal

    Removal of current sod (turf); removal excess soil (berms); Excavation/Preparation for installation of fresh nutrient-rich soil (4-6 inches deep)
  • Period: to

    Tree Pruning, Canopy Opening, Shaping

    Manicuring and pruning of the oak trees to allow for increased light and richer growth ( to include oak tree moss removal).
  • Period: to

    Internal Limestone Outline Review by Landscape Committee

    The board/landscape committee will review the final outline of the limestone border and approve the layout design before installation.
  • Period: to

    Nutrient-Rich Soil Installation

    Installation of Nutrient-Rich Soil
  • Period: to

    Limestone Curbing for Oak Tree Beds Installation

    Limestone curb to be installed per approval by board
  • Period: to

    Irrigation Installation

    Landscape irrigation installation per landscape planting plan.
  • Period: to

    Grass Installation

    Zoysia Turf Grass installation
  • Period: to

    Plant Material and Mulch Installation

    Installation plant material at entry monument and spreading of mulch in design specified areas (entry bed and tree beds)