Production schedule

By ab95340
  • Filming day1

    Filming during lunch and lesson at Kings Cross light tunnel.
    Souhila needed for performing, wearing the fur jacket and is responsible for bringing the jacket. No props will be needed.
    Filming the base track.
    Weather is expected to be 13 degrees, partly cloudy which is no problem as we will be underground in the tunnel.
  • Filming day 2

    From 9am to 12pm filming at Waterloo graffiti tunnels. Going straight there and meeting, collecting equipment the day before.
    Filming base track, with Souhila performing wearing Adidas
  • Filming day 3

    Filming during lunch and lesson at Alexandra Palace, filming base tracks.
    Souhila performing wearing dungarees.
    Weather is expected to be partly cloudy with 13 degrees again.
  • Filming day 4

    Filming at Kamile's house during lesson time 9-12pm. Everyone needed with Souhila performing wearing her furry jacket.
    The prop being used is a Supreme gun which Mehak is responsible for bringing.
  • Filming day 5

    Filming at Battersea park after 2:45pm