Production Schedule

  • Test shots

    Take test shots of possible performers for our music video
  • Sunday 30th October

    Filming in and around Camden at our locations.David, Ajah and Thomas needed to film. David be wearing a full denim outfit, Ajah will be wearing denim jeans and bomber jacket & vans while Thomas will be in a casual trousers and trainers. We will be filming various base tracks of Ajah and David performing
  • Monday 31st October

    Filming last of Camden shots. Also start filming in the Community Gardens - Shoreditch later on in the evening (around when the sun starts to set.) We will need David, Ajah and Thomas again.Costumes will be the same in the Camden Location but we have our costume change for Shoreditch.
  • Wednesday 2nd November

    During our 3 hour media lesson we will film at Leake Street tunnel in Waterloo. The graffiti filled tunnel with act as a backdrop for Thomas showing us his moves. We will also do some performing shots of Ajah and David individually. Costumes will be the same.
  • The long weekend

    During the long weekend where we miss both media lessons for the week we will be filming any shots we have missed or need to re shoot due to factors like lighting, focus etc